1913 - Page 73
Month Day Name Tax Expenditures Total WM. RETZLAFF $6.15 June 2 1 man 1 team 1 day Ground $3.50 June 13 man team balance $2.65 Total $6.15 ANTON HALLA $16.26 Snow Shoveling $1.00 June 14 1 man 1 team 1/2 day Scraping $1.75 June 16 1 man 1 team 1 day Gravel $3.50 June 17 1 man 1 team 1 day Gravel $3.50 June 18 1 man 1 team 1 day Gravel $3.50 June 19 1 man Balance $3.01 Total $16.26 ALBERT GEERDTS $22.16 Snow Schoveling $0.50 June 13 1 man 1 team 1/2 day Grating $1.75 June 14 1 man 1 team 1 day Grating $3.50 June 16 2 men 2 team Gravel 1 day $7.00 June 17 2 men 2 team l day $7.00 June 18 1 man 1 team at Balance $2.41 Total $22.16 JOHN KOCH $10.61 June Snow Schoveling $0.20 June 17 1 man 1 team 1 day $3.50 June 18 1 man 1 team 1 day $3.50 June 19 1 man 1 team 1 day at balance $3.41 Total $10.61 FRED STRUTZ $9.48 May 29 1 man 1 team 1 day Scraping $4.00 May 31 1 man 1 team 1 day Scraping $4.00 June 16 1 man 1 day Schoveling Gr. $1.48 Total $9.48 Total $64.66 $64.66
1913 - Page 74
Month Day Name Tax Expenditures Total HENRY TAYLOR $20.30 Scrap. 1 day 1/2 $0.30 June 11 2 men 1 team 1 day Gravel $5.00 June 12 2 men 1 team 1 day $5.00 June 13 2 men 1 team 1 day $5.00 June 18 2 men 1 team holing Clay
at balance$5.00 Total $20.30 GEORGE TAYER $29.41 June 11 1 man 1 team 1 day Gravel $3.50 June 12 1 man 1 team 1 day Gravel $3.50 June 13 1 man 1 team 1 day Gravel $3.50 June 14 1 man 1 team 1 day Gravel $3.50 June 16 1 man 1 team 1 day Gravel $3.50 June 17 1 man 1 team 1 day Gravel $3.50 June 18 1 man 1 team 1 day Gravel $3.50 June 19 1 man 1 team 1 day Grating $3.50 June 27 at balance 2 Load Gravel $1.41 Total 29.4 CHAS. SCHROEDER $5.70 June 13 1 man 1 team 1/2 day Gravel $1.75 June 14 1 man 1 team 1 day Gravel $3.50 June 16 1 man To balance 1 Load Gravel $0.45 Total $5.70 FRANK RETZLAFF JR $11.46 June 11 1 man 1 team Hauling Pling and work on B $2.50 June 13 1 man 1 team Hauling Gravel $3.50 June 14 2 men 2 team Gravel to balance $5.46 Total $11.46 Total $66.87 $66.87
1913 - Page 75
Month Day Name Tax Expenditures Total HERMAN MEYER $23.32 June 11 1 man 1 team 1 day $3.50 June 12 1 man 1 team 1 day $3.50 June 13 1 man 1 team day
Scraping Gravel$4.00 June 14 1 man 1 team hauling $3.50 June 16 1 man 1 team hauling $3.50 June 17 1 man 1 team hauling $3.50 June 18 1 man 1 team to balance $1.82 Total $23.32 June FRED JONAS $12.97 June 11 1 man work on Brige 10 hours $2.00 June 12 2 men 1 team 1/2 day on Brige $2.50 June 16 2 men 1 team 1 day Scraping $5.50 June 24 1 man 1 team to balance $2.97 Total $12.97 ADOLPH GRIMM $27.03 June 9 2 men two team 1/2 day Gravel $3.50 June 10 2 men two team 1 day $7.00 June 11 1 men on Brige 10 hours $4.00 June 12 1 men two team 1 day Gravel $7.00 June 13 2 men 2 team to balance $5.53 Total $27.03 ERNST DUVINK $21.88 June 11 1 man 1 team 1 day Gravel $3.50 June 12 1 man 1 team 1 day Gravel $3.50 June 13 2 men to team Gravel $7.00 June 14 2 men to team $7.00 June to balance on Bridge $0.88 Total $21.88 Total $85.20 $85.20
1913 - Page 76
Month Day Name Tax Expenditures Total FRANK RIHA $12.90 June 12 1 man 1 day 10 hours on Brige $2.00 June 18 1 man 1 day 1 day $1.50 June 19 1 man 1 team 1 day $3.00 June 29 1 man 1 team 1 day $3.00 Oct. 22 1 man Scraping 1 Ld Gravel $3.40 Total $12.90 ALBERT WODWASHEK $13.20 May 31 1 man 1 team 1/2 day Grading $1.75 June 9 2 men 1 team 1 day Grading $5.00 June 10 2 men 1 team 1 day Grading $5.00 June 11 1 man 1 day to balance $1.45 Total $13.20 MARTIN KORMORSKY $34.30 June 9 1 man 1 team 1 day Grading $3.50 June 10 1 man 1 team 1 day Grading $3.50 June 11 halt 11 Barll Cement $3.00 June 12 3 man 2 team 1 day Gravel $8.50 June 13 3 man 2 team 1 day Gravel $8.50 June 14 3 man 2 team 1 day to Balince $7.30 Total $34.3 AUGUST KLINDER $16.17 June 11 1 man 1 team 1 day Gravel $3.50 June 12 1 man 1 team 1 day Gravel $3.50 June 13 1 man 1 team 1 day Gravel $3.50 June 14 1 man 1 team 1 day Gravel $3.50 June 24 3 Lod of Gravel to balince $2.17 Total $16.17 JOSEPH KRIZEK $11.36 Snow Shoveling $0.30 June 10 1 man 1 team 1 day Grading $3.50 June 11 1 man 1 team 1 day Grading $3.50 June 13 3 Lod of Gravel $3.00 June 14 to balnce 1 Lod Gravel $1.06 Total $11.36 Total $87.93 $87.93
1913 - Page 77
Month Day Name Tax Expenditures Total ANTON KRIZEK $10.04 June 12 1 man 1 team 2 Load Gravel $2.00 June 13 1 man 1 team 3 Load Gravel $3.10 June 14 1 man 1 team 3 Load $3.00 June 16 1 man 1 team 2 to balnce $2.04 Total $10.04 ANTON KRIZEK $8.51 June 18 From 1912. Lod 3 $3.00 June 16 1 man Load 1 $1.00 June 17 1 man Load 3 $3.00 June 19 1 man to balnice $1.51 Total $8.51 AUGST LAST $4.50 Aug. 2 hole 6 Lod of Gravel $4.50 WILLIAM SCHRAMM $4.50 June 16 4 Lod of Gravel part of day Scraping $4.50 EDWARD GUETSCHOW $14.35 June 10 1 man 1 team 1 day Gravel $3.50 June 11 2 man 1 team 1 day Gravel $4.25 June 12 2 man 1 team 1 day Gravel $5.00 June 13 1 man 1 day on Bridge $1.60 Total $14.35 FRANK KRIZIZKE $18.84 Apr. 4 1 man 1/2 day $0.75 Apr. 12 1 man 1/2 day $0.75 June 10 1 man 1 team 1 day Gravel $3.50 June 11 1 man 1 team 1 day Gravel $3.50 June 12 2 man 2 team 1 day Gravel $7.00 June 13 1 man 1 team 1/2 day $1.75 Oct. 18 hol 6.65 feet of plink $1.59 Total $18.84 Total $52.23 $52.23
1913 - Page 78
Month Day Name Tax Expenditures Total JOE ZIK $16.96 Apr. 15 1 man 1 team 1 day Grading $3.50 Apr. 16 1 man 1 day Grading $2.00 Nov. 24 1 man 1 team 1/2 day Grading $1.75 Nov. 26 man team 3/4 day Grading $3.00 Nov. 28 man team 1 day repairing B $3.50 Nov. 29 man tem To Balnice $3.21 Total $16.96 JACOB FUNK $3.30 June 11 1 man 1 team 1 day Gravel $3.30 WM. SCHMIDT $3.60 June 21 2 man 1 team Scring on Bridge $3.60 EMIL PUTA $2.70 June 12 1 man 1 day on Bridge $1.50 June 13 1 man 1 day on Bridge $1.20 Total $2.70 AUGUST PUTA $3.30 June 9 1 man 1 team 1 day Grading $3.30 WENZEL MEYER $7.50 Oct. 11 1 man 1 team 1 day JOHN KRIZIZKE $3.50 Nov. 24 1 man 1 team 1/2 day
Grading ED RETZLAFF$1.75 Nov. 28 1 man 1 team to Balnice $2.25 Total $7.50 JOHN BENZINGER $8.40 June 10 1 man 1 team Scraping $3.40 June 11 2 men 1 team 1 day Scraping $5.00 Total $8.40 June 18 FRANK LECLAIR Gravel $0.14 $0.14 Apr. 4 WM. KLINDER repairing B $0.36 $0.36 June 17 EMIL RETZLAFF $0.15 $0.15 Sept. 5 RUDOLPH HALLADA on B $1.36 $1.36 Total $47.77 $47.77
1913 - Page 79
Month Day Name Tax Expenditures Total GUST EGGERT $23.33 June 10 1 man 1 team 1 day Gravel $3.50 June 11 2 men 1 team cement on B $5.00 June 12 2 men 2 team $7.00 June 13 2 men 2 team Gravel $7.00 June 14 1 man 1 team Grading $0.83 Total $23.33 FRANK BARTAL $17.14 June 10 1 man 1 team 2 load G $2.00 June 11 1 man 1 team 1 day Gravel $3.50 June 12 1 man 1 team 1 day Gravel $3.50 June 13 1 man 1 team 1 day Gravel $3.50 June 14 1 man 1 team 1 day Gravel $3.50 June 16 1 man to balince $1.14 Total $17.14 CHAS. RETZLAFF $15.06 June 10 Snow Shoveling $0.75 June 10 2 man 1 team 1 day Gravel $5.00 June 11 2 man 1 team 1 day Gravel $5.00 June 12 1 man 1 team Gravel $3.50 June 13 1 man to balance on B $0.81 Total $15.06 MRS. FRANK RETZLAFF $15.95 June 10 1 man 1 team 1 day Gravel $3.50 June 11 1 man 1 team 1 day Gravel $3.50 June 12 1 man 1 team 1 day Gravel $3.50 June 13 1 man on Bridge day $1.00 June 14 1 man 1 team 1/2 day Gravel $1.75 June 17 1 man 1 team to Balinice $2.70 Total $15.95 GEO. SHEPPER $15.84 June 10 3 man 2 team 1 day Gravel $8.50 June 11 2 man 2 team 1 day Gravel $5.84 June 12 1 man 1 day on Bridge $1.50 Total $15.84 Total $87.32 $87.32
1913 - Page 80
Month Day Name Tax Expenditures Total JOHN KRIZIZKE $14.54 April 16 1 man 1 team 1/2 day Grading $1.34 June 11 1 man 1 team 1 day Gravel $3.50 June 12 1 man 1 team 1 day Gravel $3.50 June 13 1 man 1 team 1/2 day Gravel $1.70 June 24 1 man 1 team 1 day Gravel $3.50 June 26 To balnce on Bridge $1.00 Total $14.54 JOHN KOMRSKI $21.50 Apr. 2 1/2 day on Bridge $0.75 Apr. 16 1 man 1 team 1 day Grading $3.50 June 10 2 man 1 team 1 day Gravel $4.75 June 11 2 man 1 team 1 day Gravel $5.00 June 13 2 man 1 team 1 day Gravel $5.00 June 24 2 men, 1 team 1/2 day Scraping $2.50 Total $21.50 PETER WISNEFSKY $16.27 Apr. 16 1 man 1 team 1 day Grading $3.50 June 10 2 man 2 team 1 day Gravel $7.00 June 11 1 man 2 team to Balnce Gravel $5.77 Total $16.27 LOUIS FRASH $15.44 June 18 2 man 1 team 1 day Gravel $5.00 June 19 2 man 1 team 1 day Clay $5.00 June 24 2 man 1 team 1 day Clay $5.00 June 26 To Balnise Gravel $0.44 Total $15.44 GEO. GOKEY $13.87 June 19 2 man 1 team 1 day Grading $5.00 Snow shoveling $0.15 June 24 1 man 1 team 1 day Caly $3.50 June 26 1 man 1 team 1 day Caly $3.50 June 27 1 man 1 team To Balince $1.72 Total $13.87 Total $81.62 $81.62
1913 - Page 81
Month Day Name Tax Expenditures Total PETER DOSE $16.90 Snow Shoveling $0.50 June 18 2 men 1 team 1 day Clay $5.00 June 19 2 men 1 team 1 day Clay $5.00 June 24 2 men 1 team 1 day Gravel $5.00 June 26 1 man 1 team To balinice $1.40 Total $16.90 CHAS. LECLAIR $31.31 June 12 1 man 1 day Gravel $1.50 June 13 1 man 1 day Gravel $1.50 June 18 2 men 1 team 1 day $5.00 June 19 3 men 2 team 1 day $8.50 June 24 3 men 2 team Clay $8.50 June 26 2 men 2 team To Balnice $6.31 Total $31.31 EDWARD RINGMIER $16.90 Apr. 15 1 man 1 team 1 day Grading $3.50 June 10 1 man 1 team 1/2 day Scraping $2.00 June 11 1 man 1 team 3/4 day Scraping $2.90 June 12 1 man 1 day on Bridge $1.50 June 28 2 men 2 team 1 day Grading $7.00 Total $16.90 JOSEPH GOKEY $14.30 June 11 1 man 1 team 1 day G??? $3.50 June 12 3 men 2 team 1 day Gravel $8.50 June 16 2 man 1 team 1/2 day Scraping $2.30 Total $14.30 WM. SCHMOOCK $15.33 June 12 2 men 1 team 1 day Gravel $5.00 June 14 2 men 1 team 1/2 day Gravel $2.50 Nov. 26 1 man 1 team 3/4 Grading $2.75 From 1912 repairing Road $2.00 Dec. 1 3 Load Gravel to Balnice $3.18 Total $15.33 Total $94.74 $94.74
1913 - Page 82
Month Day Name Tax Total Over Work June 9 1 man 1 day $2.00 June 10 1 man 1 day $2.00 June 11 1 man 1 day $2.00 June 12 1 man 1 day $2.00 June 13 1 man 1 day $2.00 June 14 1 man 1 day $2.00 June 16 1 man 1 day $2.00 June 17 1 man 1 day $2.00 June 18 1 man 1 day $2.00 June 19 1 man 1 day $2.00 June 24 1 man 1 day $2.00 June 26 1 man 1 day $2.00 June 27 1 man 1 day $1.25 Total $25.25 Apr. 2 Bridge repair by ZLAB F $1.25 Apr. 3 3 Rod North of JOHN KRIZIZKE $0.75 Apr. 3 West of J. FUNK $0.50 Apr. 4 1/2 Mile West of J FRANK New B $2.50 Apr. 10 School Road $0.75 Apr. 10 West of ED GUETSCHOW $0.50 Apr. 11 North of F STRUTZ 3 place $1.25 Apr. 12 West of ED GUETSCHOW 4 place $2.00 May 6 North School Scraping 1 man team $1.25 May 27 Lake Shore Road $0.50 May 31 10 Rod West of ED. GUETSCHOW $0.75 July 30 20 Acre South of G. SHEPPER Lode Stone $0.75 Aug. 12 6 Rods North J. ZIK $1.00 Sept. 5 North of JOHN KOMROSKY $0.85 Oct. 11 40 Ac North P DOSE new Bridge $2.00 Oct. 15 10 Acr West of L. FRASCH $1.75 Oct. 18 10 Acr West of L. FRASCH New Bridge $3.00 Oct. 22 1 day opening Scrping $0.50 Dec. 2 10 Rods East of P. Wisnifsky $1.75 12 x 2 G??? 10. Spike 23 nails L 4 $0.47 Total $24.07 Total $49.32
1913 - Page 83
Name Tax Refund Return JOSEPH LAFOND Pade $0.71 Gravel CHAS LECLAIR Load 392 ANTON HALLA Load 122 WM. RETZALFF CHAS SCHRODER Settled in full up to date with JOE. ZIK (Path Master) Dated this 2nd day of Dec. 1915 Town Board of Audit AUGUST LAST WALTER IHLENFELDT IGNATZ BLAHA
1914 - Page 84
Month Day Name Tax Expenditures Total WM. RETZLAFF JR $6.24 June 22 2 man 2 tine 1 day Gravel $6.24 ANTON HALLA $17.55 June 1 1 man 1 tine 1 day Scrapping $3.50 June 12 1 man 1 tine 1 day Gravel $3.50 June 15 1 man 1 tine 1 day Gravel $3.50 June 16 1 man 1 tine 1 day Gravel $3.50 June 23 1 man 1 tine 3/4 day Scrapping $3.00 June 26 to Blance $0.55 Total $17.55 ALBERT GEERDTS $20.12 June 15 1 man 1 tine 1 day Gravel $3.50 June 16 1 man 1 tine 1/2 day Gravel $1.75 June 17 1 man 1 tine 1 day Gravel $3.50 June 18 1 man 1 tine 1 day Gravel $3.50 June 20 1 man 1 tine 1/2 day Gr $2.00 Sept. 21 1 man 1/2 day on Bridge $0.85 Sept. 22 2 man 1 tine 1 day on Bridge $5.02 Total $20.12 JOHN KOCH $10.65 June 15 1 man 1 tine 1 day Gravel $3.50 June 14 1 man 1 tine 1 day Gravel $3.50 June 16 1 man 1 day $1.50 June 11 1 man 1 tine to Blance $2.15 Total $10.61 FRED STRUTZ $9.18 11 1man 1 tine Gravel $1.50 June 13 1 man 1 tine 1 day Gravel $3.50 June 15 1 man 1 tine 1 day $3.50 June 16 1 man to Blance Gravel $1.13 Total $9.18 Total $64.24 $64.24
1914 - Page 85
Month Day Name Tax Expenditures Total HENRY TAYTER $20.26 June 12 2 man 1 tine Gravel $5.00 June 13 2 man 1 tine Gravel $4.00 June 15 2 man 1 tine Gravel $5.00 June 17 2 man 1 tine Gravel $5.10 June 22 1 man To Blance $1.26 Total $20.16 GEORGE TAYTER $31.42 June 13 1 man 1 tine 1 day Gravel $3.50 June 15 1 man 1 tine 1 day Gravel $3.50 June 16 1 man 1 tine 1 day Gravel $3.50 June 19 1 man 1 tine 1 day Gravel $3.50 June 18 1 man 1 tine 1 day Gravel $3.50 June 20 1 man 1 tine 1 day Gravel $3.50 June 22 1 man 1 tine 1 day Gravel $3.50 June 25 1 man 1 tine 1 day Gravel $3.50 July 7 2 man 1 tine Schreping on B $3.42 Total $31.42 CHAS. SCHROEDER $5.65 June 19 1 man 1 tine 5 hours $2.00 June 26 1 man 1 tine 1/2 day $1.75 June 29 5 Lode of Grivel $1.90 Total $5.65 FRANK RETZLAFF $12.34 June 18 1 man 1 tine 1/2 day $1.75 June 19 1 man 1 tine hours $4.00 June 20 1 man 1 tine hours $4.00 June 25 1 man 1 tine 1/2 day Shivel $1.75 June 30 To blance $0.84 Total $12.34 Total $69.67 $69.67
1914 - Page 86
Month Day Name Tax Expenditures Total HERMAN MERYER $21.48 June 15 1 man 1 tine 1 day Grading $3.50 June 16 1 man 1 tine 1 day Graval $3.50 June 17 1 man 1 tine 1 day Graval $3.50 June 18 1 man 1 tine 1 day Graval $3.50 June 20 1 man 1 tine 1 day Graval $3.50 June 24 1 man 1 tine 1 day Graval $3.50 July 18 1 man to Blance on Bridge $0.48 Total $21.48 June FRED JONAS $14.94 June 16 1 man 1/2 day $0.75 June 17 2 man 1 day $3.00 June 18 1 man 1 day $1.50 June 19 1 man 1 day 1 poly $2.50 June 20 1 man 1 day $1.50 June 25 2 man 1 day Gravel $3.00 June 26 1 man 1 tine Gravel to blance $2.69 Total $14.94 ADATPH GRIMM $28.77 June 12 2 man 2 tine 1/2 day Gravel $3.50 June 13 2 man 2 tine 1 day Gravel $7.00 June 15 3 man 3 time 1 day $10.50 June 17 2 man 2 tine 1 day Gravel $7.00 1 man on Bridge Gravel 13 $0.77 Total $28.77 ERNST DUVEICK $21.24 Apr. 22 1 man 1 tine 1 day Grading $3.50 June 11 1 man 1 tine 1 day Gravel $3.50 June 12 1 man 1 tine 1 day Gravel $3.50 June 13 1 man 1 tine 1 day Gravel $3.50 June 15 1 man 1 tine 1 day Gravel $3.50 June 16 2 Lode (?) 3 Lode Same Clay holl on B $3.50 June 17 to Blance $0.24 Total $21.24 Total $86.43 $86.43
1914 - Page 87
Month Day Name Tax Expenditures Total HEN. SCHMOOCK $14.64 June 19 1 man 1 tine 1 day load stone $3.50 June 20 2 man 1 tine 1 day Gravel $5.00 July 7 holl Man B Cement $3.50 Oct. 16 1 man 3/4 day on Bridge $1.14 Oct. 19 1 man 1 day on Bridge $1.50 Total $14.64 FRANK RE??ISE $12.82 June 15 1 man 1 tine 1 day Gravel $3.50 June 17 1 man 1 tine 1 day holl Stone $3.50 June 18 1 man 1 tine 1 day holl Stone $3.50 June 19 1 man 1 tine to Bance $2.32 Total $12.82 ALBART WODWASHEK $12.60 Apr. 21 1 man 1 tine 1/2 day Grading $1.75 Apr. 22 1 man 1 tine 1/2 day Grading $1.75 June 17 1 man 1 tine Scrapping 1 day $3.50 June 18 1 man Scrapping $3.50 Oct. 19 1 man 12 hours on B. $2.10 Total $12.60 MARTIN KONORSKI $32.29 Apr. 22 1 man 1 tine 1 day Grading $3.50 June 1 1 man 1 tine 3/4 day Gravel $2.50 June 11 3 man 2 tine 1 day Gravel $8.50 June 12 3 man 2 tine 1 day Gravel $8.50 June 13 3 man 2 tine 1 day Gravel $8.50 June 20 1 man to Blance $0.79 Total $32.29 AUGST KLINDER $16.45 June 11 1 man 1 tine 1 day Gravel $3.50 June 12 1 man 1 tine 1 day Gravel $3.50 June 15 1 man 1 tine 1 day Gravel $3.50 June 17 1 man 1 tine 1 day Gravel $3.50 June 18 1 man to Banlce $2.45 Total $16.45 Total $88.80 $88.80
1914 - Page 88
Month Day Name Tax Expenditures Total JOE KRIZEK $12.18 18 1 man 1 tine 1 day Gravel $3.50 June 19 1 man 1 tine 1 day Scrpping $3.50 June 20 1 man 1 tine 1 day Scrapping $3.50 June 23 1 man 1 tine 1 day to Baline $1.68 Total $12.18 ANTON KRIZEK $11.65 June 19 1 man 1 tine 3/4 day Gv. $2.50 June 20 1 man 1 tine 1 day Gv. $3.50 June 23 1 man 1 tine 1 day Gv. $3.50 June 24 1 man 1 tine to Blance $2.15 Total $11.65 AUGST LEST $5.45 June 26 1 man 1 tine 1 day Gravel $3.50 Nov. 28 To Balane $1.95 Total $5.45 WM. SCHRAMM $5.18 June 20 2 man 1 tine 1 day Scrapping $5.18 JOHN KOMORSKI $21.41 June 11 1 man 1 tine 1 day Gravel $3.50 June 13 1 man 1 tine 1 day Gravel $3.50 June 15 2 man 1 tine 1 day Gravel $5.00 June 16 2 man 1 tine 1/2 day Gravel $3.00 June 17 2 man 1 tine 1 day Gravel $5.00 Oct. 13 1 man on Brige 1 day $1.41 Total $21.41 EDWARD GUETSCHOW $17.31 June 11 2 Lode Gravel $1.25 June 13 2 man 1 tine 1 day Gravel $5.00 June 15 1 man 1 tine 1 day Gravel $3.50 June 16 1 man 1 tine 1 day Gravel $3.50 July 7 1 man on Brige 10 hours $2.00 Oct. 15 1 man on Brige 1/2 day $0.75 Oct. 19 1 man on Brige 1 day $1.31 Total $17.31 Total $73.18
1914 - Page 89
Month Day Name Tax Expenditures Total FRANK KRIZIZKE $20.61 10 1 man 1 tine 3/4 day Grading $2.50 June 12 1 man 1 tine 1 day Graded $3.00 June 13 1 man 1 tine 1 day Graded $3.00 June 15 2 man 1 tine 1 day Graded $5.00 June 16 1 man 1 tine 1 day Graded $3.50 Oct. 12 1 man 1/2 day on Brige $0.71 Oct. 15 1 man 1 day on Brige $1.50 Oct. 22 1 man to Blince $1.40 Total $20.61 JOE ZIK $18.11 Apr. 14 1 man 1 tine 1 day Grading $3.50 Oct. 16 holling engine Concereat ??er $3.50 Oct. 19 1 man 1 tine 1 day Scrpping on B $3.50 Aug. 29 Holling 10 B Ceamnet for Bollring $2.61 Nov. 27 2 man 1 tine 1 day Grading $5.00 Total $18.11 MRS. JACOB FUNK $4.05 June 13 1 man 1 tine 1 Lod Gravel $1.00 June 15 1 man 1 tine 2 Lod Gravel $2.00 June 16 1 man 1 tine 2 Lod Gravel $1.05 Total $4.05 WM SCHMIDT $4.05 Oct. 16 1 man 1 day on Brigde $1.50 Nov. 3 1 man 1 tine Scapping Bridge $2.55 Total $4.05 June EMIL POUTA $3.60 June 18 1 man 1 day $1.50 June 19 1 man 1 day $1.50 20 1 man to Banlce $0.60 Total $3.60 AUGST POUTA $3.78 June 25 1 man 1 tine 1 day S????? $3.00 June 26 1. Loud Grivel $0.78 Total $3.78 Total $54.20 $54.20
1914 - Page 90
Month Day Name Tax Expenditures Total WENZEL MEYER $8.10 July 28 GUST EAGGER 2 man 2 tine 1/2 day Grading $3.50 Sept. 11 GUST EAGGER 2 man 2 tine 3/4 day Grading $4.60 Total $8.10 JOHN BERTZINGER $9.00 June 19 2 man 1 tine 1/2 day SC $2.50 June 20 2 man 1 tine 1/2 day SC $5.00 June 22 1 man To Banlce 1 day $1.50 Total $9.00 GUSTE EGGERT $23.75 May 26 1 man 1 tine 1/2 day Grading $1.75 June 11 1 man 1 tine 1 day Gravel $3.50 June 12 2 man 2 tine 1 day Gravel $6.25 June 13 2 man 2 tine 1 day Gravel $7.50 June 15 1 man 1 tine 1 day Gravel $4.75 Total $23.75 FRANK BARTAL $17.58 June 13 2 Load Grivel $1.58 June 17 1 man 1 tine 1 day G $3.50 June 18 1 man 1 tine 1 day G $3.50 June 19 1 man 1 tine 1 day Stone $3.50 June 20 1 man 1 tine Stone on School R $3.50 July 7 1 man 10 hours on Bridge $2.00 Total $17.58 CHAS. RETZLAFF $16.95 June 13 1 man 1 tine 1 day Grivel $3.50 June 15 4 Load $4.00 June 16 1man 1 tine 1 day Grivel $3.50 June 17 2 man 1 tine 1 day Grivel $5.00 Oct. 16 1 man on new Bridge $0.95 Total $16.95 Total $75.38 $75.38
1914 - Page 91
Month Day Name Tax Expenditures Total MRS FRANK RETZLAFF $17.66 June 12 1 man 1 tine 1 day Grading $3.50 June 15 1 man 1 tine 1 day 1 Grivel $3.50 June 17 1 man 1 tine 1 day 1 Grivel $3.50 June 20 4 Load $4.00 Oct. 27 1 man 1 tine Grading $3.16 Total $17.66 JOHN KRIZIZKE $14.01 June 15 1 man 1 tine 1 day Grivel $3.50 June 19 1 man 10 hours on School Rd $2.00 July 6 1 man 1 day on New Bridge $1.50 Oct. 12 1 man 1 tine 3 Loat Grivel $3.00 Oct. 15 1 man 1 day on Bridge $1.51 Oct. 19 1 man 1 day engine 1/2 day $2.50 Total $14.01 Apr. GEORGE SHEPPER $16.87 May 14 2 man 1 tine 1 day Grading $5.00 June 26 1 man 1/2 day $0.75 June 10 1 man 1 tine 3/4 day Grading $2.50 June 12 2 man 1 tine 1 day Grivel $4.25 June 13 1 man 1 tine 1 day Grivel $3.50 Oct. 15 1 man on New Bridge $0.87 Total $16.87 PETER WISFINSKY $17.37 Apr. 14 1 man 1 tine 1/2 day Grading $1.75 June 11 1 man 1 tine 1 day Grivel $3.50 June 12 1 man 1 tine 1 day Grivel $3.50 June 13 1 man 1 tine 1 day Grivel $3.50 June 15 1 man 1 tine 1 day Grivel $3.50 June 18 1 man To Blince $1.62 Total $17.37 Total $65.91 $65.91
1914 - Page 92
Month Day Name Tax Expenditures Total LOUIS FRASCH $16.19 June 18 2 man 1 tine 1 day Gravel $5.00 June 20 2 man 1 tine 1 day Gravel $5.00 June 22 2 man 1 tine 1 day Gravel $5.00 June 24 1 man 1 day Grading $1.19 Total $16.19 GEORGE GOKY $13.77 June 12 1 man 1 tine 1 day Gravel $3.50 June 13 1 man 1 tine 1 day Gravel $3.50 June 18 1 man 1 tine 1 day Gravel $3.27 June 20 1 man 1 tine 1 day Gravel $3.50 Total $13.77 PETER DOSE $18.00 June 16 2 man 1 tine 1 day Gravel $5.00 June 17 2 man 1 tine 1 day Gravel $5.00 June 18 2 man 1 tine 1 day Gravel $5.00 June 19 1 man 1 tine 1 day Gravel $3.00 Total $18.00 CHAS LECLAIR $29.08 June 23 2 man 2 tine 1 day Grading $7.00 June 24 2 man 2 tine 1 day Grading $7.00 June 25 2 man 2 tine 1 day Grivel $7.00 June 26 2 man 2 tine 1 day Grivel $7.08 July 7 1 man 1 tine Bridg 1 day $1.00 Total $29.08 JOSEPH GOKY $15.77 June 12 2 man 1 tine 1/2 day Scrapping $2.50 June 13 2 man 1 tine 1 day Scrapping $5.00 June 15 2 man 1 tine 1 day Grivel $5.00 June 16 1 man 1 tine To Blanec $3.27 Total $15.77 Total $92.81 $92.81
1914 - Page 93
Month Day Name Tax Expenditures Total EDWARD RINGMYER $17.26 June 11 3 Load Gravel $3.20 June 12 1 man 1 tine 1 day Gravel $3.50 June 13 1 man 1 tine 1 day Gravel $3.50 June 15 1 man 1 tine 1 day Grading $3.50 June 16 1 man 1 tine 1 day Grading $3.56 Total $17.26 RUDOLPH HALLADA $1.32 Apr. 21 1 man 1 tine part day Grad. $1.32 June 25 NOMUMER LECLAR $0.17 $0.17 June 15 CHRAS KLINDER $0.17 $0.17 June 15 JOHN KORMORSKI JR $0.17 $0.17 July 14 OSCAR TAYLER $0.17 $0.17 Total $19.26 $19.26
JOE ZIK Over Work June 10 order Man 1 1/2 day $1.00 June 11 Oardering man 1 day $2.00 June 12 1 day $2.00 June 13 1 man day $2.00 June 15 1 man 1 day $2.00 June 17 1/2 day $1.00 June 18 1 man 1 day $2.00 June 19 1 man 1 day $2.00 June 20 1 man 1 day $2.00 June 22 1 man 1/2 day $1.00 June 23 1 man 1 day $2.00 June 24 1 man 1 day $2.00 June 25 1 man 1 day $2.00 June 26 1 man 1/2 day $1.00 June 16 1 man 1 day $2.00 May 23 3/4 of day Grading $1.50 May 26 1 man 1 tine 1/2 day Grading $2.25 Sept. 11 part of day Grading $1.25 July 28 1 man 1/2 day Grading $1.00 Total $32.00
1914 - Page 94
Month Day Name Expenditures Bridge Work Apr. 17 20 Rods East E Ringmier $0.50 June 9 20 Rods East 9 #16 pil $1.50 July 6 10 Rods West G. TAYTR new B $2.00 July 7 1 man 1 tine 1 day on new Bridg $3.50 July 18 1 man 1 tine Hold 1000 feet plinks S MI?? $1.75 Sept. 1 8 RODS North AL GEERDTS B $2.00 Sept. 3 8 RODS North AL GEERDTS B $1.50 Oct. 15 1/2 mile West Mrs. J FRASCH New B $2.00 Oct. 20 20 Acr South E GOWATOW 10# 18P $2.50 Oct. 22 1/2 DAY ON New Bridge $1.00 June 8 4 Rod South Ma KOMESKY 9# 20p $1.50 June 8 20 Acr East J FUNK 9# 20 pie $1.50 Nov. 3 3 Rods South J GOKY Scrapping time $1.75 Nov. 7 1/2 Mile West J FUNK Scrapping on Brige $1.75 5 post 8# 6 ?rm E RINGMEIR $1.00 Oct. 19 5 Gallon Gasoline $0.45 Nile $0.10 Light on Bridge $0.75 Total $27.05 $32.00 Total $59.05 Load Grivel 1914 JOHN KOCK 13 Lodes ANTON HALLA 417 Lodes CHAR SCHRODER 5 Lodes WM. RETZLAFF 2 Lodes Snow